in keeping track...
the main floor
- kitchen was renovated...down to the studs and back again
- floors in kitchen and old living room were repaired and sanded to a matte finish (makes the old floors look new
- patio doors installed (2016)
- bathroom refresh for 2 of the 4 bathrooms, with the main floor bathroom getting the biggest change - no more bathroom door opening directly into the kitchen (ugh), and change out of toilet, vanity, lighting and mirror (I will be installing new tile when I get the chance, and re-doing the bathtub and surround will wait.
- opening between old dining room (now the living room), and the treatment room/office has been separated with old french doors
- old door that blocked a window has been replaced with a french door
- blocked and drywalled door to treatment room/office has been replaced with an old french door
- wallpapered feature walls into new living room (and covered up cracks), allowed us to not have to repaint the entire space
- wallpapered entire upper half of front entrance/foyer and up to the next floor
- tiled foyer (2019)
2nd floor
- painted and wallpapered older son's room
- wallpapered over very dark purple in bathroom - nice refresh as the rest of it was in good shape
3rd floor
tiny rooms knocked out to create one space (2019)
wallpaper (2019)
refurnished (2018 - now)
there is still a lot to do, inside and out to bring this beautiful, old, red brick into the state it should be in - loved, lived in and its best self!
0 comments:
Post a Comment