Saturday, October 15, 2022

honouring the home - before and during...

 


in keeping track...


 the main floor 

- kitchen was renovated...down to the studs and back again

- floors in kitchen and old living room were repaired and sanded to a matte finish (makes the old floors look new

- patio doors installed (2016)

- bathroom refresh for 2 of the 4 bathrooms, with the main floor bathroom getting the biggest change - no more bathroom door opening directly into the kitchen (ugh), and change out of toilet, vanity, lighting and mirror (I will be installing new tile when I get the chance, and re-doing the bathtub and surround will wait.

- opening between old dining room (now the living room), and the treatment room/office has been separated with old french doors

- old door that blocked a window has been replaced with a french door

- blocked and drywalled door to treatment room/office has been replaced with an old french door

- wallpapered feature walls into new living room (and covered up cracks), allowed us to not have to repaint the entire space

- wallpapered entire upper half of front entrance/foyer and up to the next floor

- tiled foyer (2019)


2nd floor

- painted and wallpapered older son's room

- wallpapered over very dark purple in bathroom - nice refresh as the rest of it was in good shape


3rd floor

tiny rooms knocked out to create one space (2019)

wallpaper (2019)

refurnished (2018 - now)


there is still a lot to do, inside and out to bring this beautiful, old, red brick into the state it should be in - loved, lived in and its best self!



0 comments:

Post a Comment